Designed a division of 21.5-acre parcel into 65 residential lots. This was a very large project with multiple moving parts. We faced a large encroachment problem that required working with legal and jurisdictional parties. We also provided civil engineering design for the large plat, getting it ready for development. 

Services Beyler Provided:

  • Land Surveying
  • Civil Engineering

Deliverables Beyler Provided to Complete Project:

  • Boundary Survey
  • Preliminary Plat Application: Prelim Design, Lot Configuration, SEPA Report
  • Public Hearing Meeting
  • Meetings with City of Buckley for unique Stormwater design
  • Site Grading
  • Site Drainage
  • Sanitary Sewer Design
  • Temporary Erosion & Sediment Control (TESC) plans
  • NPDES Permit
  • Construction Staking
  • Final Plat Documents
  • Record of Survey Drawings

Project started with Baseline Engineering and ended with Beyler Consulting, when Beyler acquired Baseline in August 2017. 